Bathroom 5
End of Friday 2007-03-02, fifth day of rebuilding.
Previous
Bathroom 4 Next
Bathroom 6
Almost there...
The toilet is back! Whee! And a lot of tools left so that the working can start right away on Monday morning.
And the radiator is back!
Not much there though.
The tool that put paste between the stone-plates.
A drill.
Holes in the wall where the washbasin will be.
And... Eh... some shiny stuff.
The hallway is still a mess. But there is the new toilet. It was nothing wrong with my old one though.
And the new washbasin
Some stuff for the bathtub.
/ [Hedda]
| Show these comments on your site |